PIPELINE INFORMATION MANAGEMENT SYSTEM


    Pipeline Information Management     System

      Project Planning

          Work Flow Management
          Document Approval and Control              System
          Procurement and delivery tracking              System
          Activity Scheduling and Monitoring              System

      Electronic Documentation

      Construction Management

      GIS

      Maintenance Module

      PIMS Benefits

      PIMS Technology

      PIMS Experience

      Delivery Model

      Customer Testimonials



CONSTRUCTION MANAGEMENT

Construction Management

Construction Module consists of sub modules as shown in the above diagram. Progress of each activity is reported in the different formats like
    • Summary or individual data,
    • Graphical formats
    • GIS maps.


Pipeline activities tracked and digitized are-
    • ROU
    • clearing and grading
    • Pipe receipt and hauling
    • Trenching
    • Stringing
    • Bending
    • Welding including weld repair details
    • NDT (AUT/RT/MUT/LPT/MPT)
    • Joint Coating
    • Concrete coating
    • Lowering
    • OFC laying
    • All crossings and HDD
    • TCP/PCP
    • OFC Jointing
    • Hydro-testing
    • Station works
    • Restoration
    • Pre-commissioning activities

The above list is not limited and can be extended, customizable as per project requirements.

Daily Progress Report

PIMS  DPR

Joint Report
A joint report represents and gives detail of each joint from welding to backfilling. Tie-in and free tie-in joints, repaired joints etc are also represented with respective legend as shown in below figure. Each Joint will have UTM Coordinates.

corel

  • S-Curve – To assess the current project status w.r.t planned schedule for each activity as well as cumulative (weightages).
  • Velocity Cart: Work done for a particular activity in chainage vs week.
  • Cumulative activity March chart.

S - Curve

untitled

Cumulative Activity March Chart (Schematic)

Compliance Report Generation
Feature to query any left out activity for any joint within a range prior to lowering or hydro testing.
    •Pre Lowering compliance report generation
    •Pre Hydro test compliance report generation

Lowering compliance report gives the complete history of joints with the conformation that pre-selected Section is ready to lower with the details of calculated section length to be lowered. It gives exception of activities not performed or not reported.

Lowering compliance

AGI / SV Station Works
Stage wise construction progress report of stations like IP, SV, Scrapper is shown in reports and updated on a daily basis.
Stages covered are-
    • Civil
    • Mechanical/Piping
    • Electrical
    • Instrumentation

corel

Real Time Pipe Book Generation
The electronic pipebook is a fully linked index having relation to each pipe and its usage from stringing to hydrotesting. IMS pipe book is auto-generated from the digitization of inspection reports. A special query can generate pipebook having select fields, select chainages or select joint number range.