PIPELINE INFORMATION MANAGEMENT SYSTEM


    Pipeline Information Management     System

      Project Planning

          Work Flow Management
          Document Approval and Control              System
          Procurement and delivery tracking              System
          Activity Scheduling and Monitoring              System

      Electronic Documentation

      Construction Management

      GIS

      Maintenance Module

      PIMS Benefits

      PIMS Technology

      PIMS Experience

      Delivery Model

      Customer Testimonials



DOCUMENT APPROVAL & CONTROL SYSTEM

Document Approval & Control System
Engineering and document and drawing approval status is tracked using this module.

Features:-
 1. PIMS configures the Document/ Drawing list from the Document control log & Material Control Log.
        •  Document/Drawing Code
        •  Category
        •  Sub Category
        •  Document Name
        •  Proposed date of Creation
        •  Estimated date range of Internal Document Control
        •  Date range for Submitting to Client for comments
        •  Date range for Incorporating comments
        •  Date range for Issuing for approval
        •  Date of Approval (AFC),

 2. When a document/drawing is approved, it is scanned and attached.
 3. Exhaustive search and summary reports are generated.
 4. The document/drawing is uploaded as soon as its status is Approved.

                                                                     JPAC Technologies Pvt. Ltd. All rights reserved.                                                 Home | Sitemap | Disclaimer